Current lead time by area
Queue drain at planned capacity, worst first. Add the job’s own duration for a quote.
Needs review
0
New and re-review work orders are scheduled but not yet dispositioned.
Load heat, next 8 weeks
Hours committed vs hours available. Over 100% means the week is oversubscribed. Capacity is still PLANNED in people in the grid below; hours is what the schedule is constrained by.
This is a recommendation for every open work order, not a record of committed work. Each one is counted here whether or not anyone has reviewed it, so approving a reschedule does not add load — the job was already in the map. Only rejecting a work order changes these numbers, by taking it out.
Weekly hours committed vs available
Bar = hours committed. Orange line = hours available (people multiplied by hours per person per week). Same basis as the heat grid above.
Schedule
0
Every bar is read from the levelling engine, never recomputed here. Wire runs first, assembly follows it with no gap.
Work orders
0
Capacity plan — people per area per week
Blank = demonstrated baseline. 0 = a genuinely dark week. Clear a cell to go back to baseline.
Assumptions
Stated assumptions, not measured truths. Saving writes a new config version.
Data quality
Anything here is excluded from the schedule or weakens it. Fix at the source.